December 28, 2024 08:33 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
India mourns as nation bids farewell to Manmohan Singh with full state honours | Narendra Modi-led Union Cabinet passes 'Condolence Resolution' on passing of ex-PM Manmohan Singh | Space will be allocated for Manmohan Singh's memorial, announces Centre | He was my friend, philosopher, and guide: Sonia Gandhi remembers Manmohan Singh in an emotional post | Vladimir Putin condoles Manmohan Singh's death, calls him 'outstanding statesman' | Congress writes to PM Modi seeking space for building a memorial to Manmohan Singh | Manmohan Singh will be remembered as a kind person, a learned economist, and a leader dedicated to reforms: PM Modi | Russian ambassador to India Denis Alipov grieves Manmohan Singh's demise | Mumbai terror attack shook Manmohan Singh badly, recalls former deputy NSA | I have lost a mentor and guide: Rahul Gandhi writes on Manmohan Singh's demise
Indian Railways
Photo courtesy: UNI

Indian Railway runs track car successfully on Indo-Bangladesh line from Agartala

| @indiablooms | Aug 25, 2023, at 04:55 am

Agartala/IBNS/UNI: The Indian Railway on Tuesday made a successful run of a specially designed track car on the newly built railway line for the most ambitious cross-border connectivity between India and Bangladesh from Agartala, which will connect Kolkata via Dhaka.

Railway officials here on Wednesday said that an uninterrupted run of track cars cleared the way for a trial run of a railway engine between Agartala and Gangasagar railway stations in Akhaura, Bangladesh, which took about 75 minutes to reach the zero line at the international border.

Officials said the test train will take a few more days to finalise all necessary preparations.

However, there has been an indication that perhaps the inauguration of Indo-Bangladesh train service will happen on September 9, when the Prime Ministers of both countries will sit together in New Delhi.

The track car, responsible for laying stones on the railway line, has been operational on the route for several days, and thereafter, a trial run of the railway engine will take place, the officials stated.

Meanwhile, Sharat Sharma, head of the project on the Bangladesh side, claimed that around 6.5 kilometers of track have been laid in the Akhaura section and that the entire railway line will be ready for train movement within a week in Bangladesh.

The Ministry of Development of the Northeast Region (DoNER) sanctioned Rs 580 crore for the construction of a railway corridor of 5 km in the Indian part connecting Agartala with Bangladesh in 2016.

The Ministry of External Affairs has also funded the remaining 10 km of railway stretches in Bangladesh territory, which were supposed to be completed five years ago.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.