April 26, 2026 12:37 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
YouTuber Saleem Wastik arrested in connection with 1995 kidnapping and murder case | Maharashtra Police makes first arrest months after Akshay Kumar revealed daughter’s cyber harassment | Big political shake-up: KCR’s daughter Kavitha floats new TRS after BRS fallout | ED raids multiple Bengal locations in PDS scam probe amid assembly polls | Bengal polls: Mob attacks central forces, 3 CAPF personnel injured in Birbhum | ‘People voting to protect their rights’: Mamata says high turnout backs TMC in Bengal | ‘Fear is being defeated’: PM Modi says high voter turnout signals BJP win in Bengal | Crude bomb attack in Murshidabad’s Nowda as violence hits Bengal polling | ‘Mamata Banerjee’s politics fuelled BJP growth in Bengal’: Rahul Gandhi | 'Will never forget’: Nation remembers Pahalgam victims as leaders vow strong fight against terror
Mumbai Metro
Image: Wikimedia Commons

Jindal Stainless supplies stainless steel for Mumbai Metro Project flagged off by PM Narendra Modi

| @indiablooms | Jan 20, 2023, at 09:51 pm

Mumbai: Giving an impetus to the government’s ‘Make in India’ initiative, the Hon’ble Prime Minister launched Phase 2 of the Mumbai Metro Line 2A and 7.

Jindal Stainless has supplied stainless steel for the outer panels, car body, structurals, roofs, interiors, underframes, and other stainless steel applications for the project.

The Mumbai Metro line was inaugurated by the PM in a Dedication Ceremony organized in Mumbai yesterday. The line will be opened for commute from today.

For this Mumbai Metro project, Jindal Stainless started supplying high-quality stainless steel grade 301LN in various tempers and in 2J finish. The supply, which started in January 2021, is expected to continue till December 2025.

Jindal Stainless is supplying material from its different manufacturing units across the country for the project.

The train sets are being developed by Bharat Earth Movers Limited (BEML) in batches and out of the total 576 coaches required for this project, 144 coaches have been supplied so far.

Approximately 5,760 metric tons of stainless steel would be consumed to develop 18.6 km 2A Metro line and 16.5 km 7 Metro line respectively.

Commenting on this development, MD, Jindal Stainless, Abhyuday Jindal, said, “As a completely recyclable metal, stainless steel is the most sustainable choice of material to enable a low-waste circular economy. We are always proud to partner metro and railway projects, playing our part in ensuring safe, sustainable, and hygienic commute for people.”

In the past, Jindal Stainless has supplied to metro projects in Sydney and Queensland, apart from Delhi, Kolkata, Bangalore, Chennai, and other metro projects. 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.