December 28, 2024 01:53 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
He was my friend, philosopher, and guide: Sonia Gandhi remembers Manmohan Singh in an emotional post | Vladimir Putin condoles Manmohan Singh's death, calls him 'outstanding statesman' | Congress writes to PM Modi seeking space for building a memorial to Manmohan Singh | Manmohan Singh will be remembered as a kind person, a learned economist, and a leader dedicated to reforms: PM Modi | Russian ambassador to India Denis Alipov grieves Manmohan Singh's demise | Mumbai terror attack shook Manmohan Singh badly, recalls former deputy NSA | I have lost a mentor and guide: Rahul Gandhi writes on Manmohan Singh's demise | Manmohan Singh left strong imprint on our economic policy over years: PM Modi | A rare leader who spoke softly but achieved monumental strides: Gautam Adani mourns Manmohan Singh's death | Instagram influencer and freelance RJ Simran Singh dies by suicide in Gurugram

Nitin Gadkari to lay foundation stone for six-lane NH project to connect Ring Road – DND Junction with Delhi-Mumbai Expressway

| @indiablooms | Feb 28, 2019, at 03:13 pm

New Delhi, Feb 28 (IBNS): Union Minister for Road Transport & Highways, Shipping and Water Resources, River Development and Ganga Rejuvenation Nitin Gadkari will lay the foundation stone for a six-lane access-controlled NH project at Kalindi Kunj-Meethapur Road in Delhi on Friday.

The over 59 km long highway will start at Ring Road-DND junction and will pass through Kalindi bypass and Faridabad-Ballabhgarh bypass, and will finish at the interchange of Delhi-Mumbai Expressway at KMP, read a government statement.

The cost of this project is estimated at Rs 3580 crore.

The project will have 3+3 lane service roads on either sides for about 29 km, 7.350 km of elevated section with two level crossings at four locations of Metro line, 18 new underpasses, and nine interchanges with improved junctions.

The project will decongest Delhi with reduction of traffic congestion in Ashram-Badarpur-Faridabad-Ballabhgarh region.

This is expected to result in reduction of vehicular pollution.

This project would be in addition to the nine other progects being implemented for decongesting NCR Delhi.

These include the 3 km signal free corridor from Dhaula – Kuan to Airport at a cost of Rs 280 Crore, which is about 40 % completed; the 22 km, 6-lane elevated corridor on Gurugram-Sohna Road costing Rs 2000 Crore on which work has started; 8-lane Delhi-Panipat highway from Mukarba Chowk to Panipat on NH-1 being constructed at a cost of Rs 2300 and nearly 48 % done; the 29 km, 8 lane access controlled Dwarka Expressway costing about Rs 9500 crore on which work has started; package II, III and IV of Delhi-Meerut Expressway costing Rs 5900 Crore, where package II is  36 % done, package III in 76% done and package IV is 32    % done; 4 laning of 124 km Khekra – EPE junction to Shamli-Saharanpur (NH-709 B) at a cost of about Rs 1200 Crore; Rangpuri Bypass to connect Dwarka/NH-08 with Vasant Kunj-Nelson Mandela Road at a cost of Rs 1000 Crore, which is in DPR stage; 75 km Urban Extension Road (UER-2) third Ring Road for Delhi under Bharatmala to be developed at a cost of Rs 4000 Crore which is in DPR stage and the 31.3 km, 6-lane access controlled corridor from Akshardham NH24 Junction to EPE Junction on Baghpat Road at a cost of about Rs2600 Crore.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.