May 12, 2026 02:35 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Suvendu Adhikari Cabinet clears BSF land transfer, census rollout, Ayushman Bharat in Bengal | Mamata govt's welfare schemes to continue: Bengal CM Suvendu Adhikari after first cabinet meeting | ‘One of life’s most emotional moments’: PM Modi performs grand Mahapuja at Somnath Temple | UPI trail cracks Suvendu Adhikari aide Chandranath Rath murder case; three arrested | Totally unacceptable: Trump rejects Iran’s peace plan in explosive showdown | Big defence boost: India successfully tests advanced Agni MIRV missile | India, Singapore unite for tough action against terror and transnational crime | TVK crosses majority mark with VCK, IUML support | I bow before Bengal: PM Modi’s powerful gesture at Suvendu Adhikari’s oath goes viral | Bengal turns a new page: Suvendu Adhikari takes oath as CM amid massive NDA show of strength

Vehicles leave Jammu for Srinagar on Kashmir highway

| @indiablooms | Feb 09, 2020, at 04:55 pm

Srinagar/UNI: Hundreds of vehicles, including trucks carrying essential commodities and oil tankers, left Jammu for Kashmir early in the morning as only one-way traffic continue to ply on the 270-km-long Srinagar-Jammu national highway, the road connecting the valley with the rest of the country.

One-way traffic has proven to be a success and for the past more than over two weeks, traffic ply normally on the highway, which otherwise was witnessing heavy traffic jam for hours.

On Sunday, traffic will ply from Jammu to Srinagar and no vehicle be allowed from opposite direction, a traffic police official told UNI this morning.

He said Light Motor Vehicles (LMVs) were allowed to move in the morning while Heavy Motor Vehicles (HMVs) will be allowed in the afternoon. “Only one-way traffic will continue on the highway till further orders,” he said.

Meanwhile, the 434-km-long Srinagar-Leh national highway, the only road linking Union Territory (UT) of Ladakh with Kashmir, remained closed for the past over two months. There is more than 6 feet to 12 feet of snow on the highway, including at Zojila pass, which has frozen due to below freezing temperature.

Similarly, the historic 86-km-long Mughal road, connecting Shopian in south Kashmir with Rajouri and Poonch and Anantnag-Kishtwar road remained closed due to accumulation of snow for the past two months. “These roads are likely to reopen in March-April,” officials said.  

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.