July 22, 2026 12:26 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Rahul Gandhi, Priyanka Gandhi Vadra lead Congress march to PM Modi's residence over student protest crackdown | 'We can't ignore his concerns': Delhi HC gives Sonam Wangchuk big relief, clears shift to private hospital | 'Students are being tortured': Mamata Banerjee offers to join CJP protest in Delhi | Sikkim tunnel horror: 8 dead, several feared trapped after NHPC project collapse | As NEET protests intensify, PM Modi defends govt action, calls for 'foolproof' education system | After NEET storm, Modi govt faces fresh challenge as farmers march to Delhi over India-US trade deal | Jantar Mantar reclaimed! CJP defies overnight police eviction, returns to protest site | 'Listen to the students': Diljit Dosanjh breaks silence on CJP protests, says 'They'll call me anti-national again' | 'Abhijeet Dipke has been picked up': CJP alleges police detained founder as Parliament march sparks chaos | Major twist in CJP protest: Abhijeet Dipke ends hunger strike

Alstom T&D India to help harness solar power potential of Rajasthan

| | Dec 17, 2014, at 07:21 am
Kolkata, Dec 16 (IBNS): Alstom T&D India has secured an order worth around 151.5 crore from Rajasthan Rajya Vidyut Prasaran Nigam Limited (RRVPNL) to supply a 400/220 kV substation in Bhadla,and expand the existing 400/220 kV substation in Bikaner, both situated in the state of Rajasthan.

The new 400 kV grid substation in Bhadla will help evacuate power from the Bhadla solar park and other upcoming solar parks in the area, while the expansion of the 400/220 kV substation at Bikaner will facilitate the exchange of solar power generation with the national grid.

Alstom T&D India will design, engineer, manufacture, install and commission the Bhadla 400/220 kV substation, including twenty 400 kV bays and seventeen 220kV bays. The Bikaner expansion project includes the supply of eight 400 kV bays, transformers, circuit breakers, control and protection relays and substation automation system. All equipment will be manufactured and supplied from Alstom T&D India’s manufacturing.

Rathin Basu, Managing Director, Alstom T&D India said, “Clean renewable energy sources are imperative for a sustainable future. Recent years have witnessed a shift in the energy mix of the country and clean power has never been more important."

"Alstom is pleased to offer its leading and advanced solutions to strengthen the Rajasthan transmission network and ensure efficient, reliable and safe evacuation of clean power. We have delivered successful projects for RRVPNL in the past and we aim to continue," he added

He also said, "These projects are part of the state government’s initiative to upgrade and scale the state’s transmission infrastructure for the transmission of clean energy to the national grid. Rajasthan is amongst the few states chosen by the Ministry of New and Renewable Energy (MNRE)as models for the proposed mega solar parks,whose installed solar power capacity will be scaled to 100,000 MW by 2022."

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.