July 22, 2026 03:39 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Rahul Gandhi, Priyanka Gandhi Vadra lead Congress march to PM Modi's residence over student protest crackdown | 'We can't ignore his concerns': Delhi HC gives Sonam Wangchuk big relief, clears shift to private hospital | 'Students are being tortured': Mamata Banerjee offers to join CJP protest in Delhi | Sikkim tunnel horror: 8 dead, several feared trapped after NHPC project collapse | As NEET protests intensify, PM Modi defends govt action, calls for 'foolproof' education system | After NEET storm, Modi govt faces fresh challenge as farmers march to Delhi over India-US trade deal | Jantar Mantar reclaimed! CJP defies overnight police eviction, returns to protest site | 'Listen to the students': Diljit Dosanjh breaks silence on CJP protests, says 'They'll call me anti-national again' | 'Abhijeet Dipke has been picked up': CJP alleges police detained founder as Parliament march sparks chaos | Major twist in CJP protest: Abhijeet Dipke ends hunger strike

Essar's Raniganj Coal Bed Methane asset in WB crosses 0.5 million scmd production

| | Apr 06, 2015, at 09:30 pm
Mumbai, Apr 6 (IBNS) : Essar Oil, a leading player in India's Oil & Gas Sector, on Monday said that gas production at its Raniganj Asset in West Bengal has crossed 0.5 million standard cubic metres per day (scmd), thereby making it India’s largest CBM gas producer.

While nearly 100 wells have been already placed on gas production, additional 155 wells have been drilled and are at various stages of the hydrofracking-completion-dewatering cycle for further gas production ramp up.

The company has built a high quality infrastructure gas conditioning and compression stations, in-field pipelines of 120 kms. and last mile pipeline connectivity network to end users of approx. 60 kms.

The company anticipates completing the development program ahead of the May 2016 deadline as per the Contract with the Government of India.

With a total investment outlay of approx. INR 4000 crores, the Raniganj Project is a first of its kind in India aimed to responsibly produce Methane Gas from the coal seams located 1000 meters or deeper below the ground.

Gas from this Project shall be the feedstock to the priority fertiliser sector with the anchor customer being Matix Fertiliser & Chemicals Ltd., having the world’s largest single stream plant for ammonia and urea located in West Bengal.

“With unity of conception, technology and team effort, we have been able to register a multifold increase in CBM production to 0.55 million scmd and expect to ramp up delivery to 1.2 million scmd over the next few months by bringing wells on production stream which are drilled and presently under completion and dewatering phase," said Manish Maheshwari, CEO-E&P, Essar Oil.
 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.