July 22, 2026 08:33 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'We won't leave Jantar Mantar until Dharmendra Pradhan resigns': CJP draws red line | 'Don't waste our time': Supreme Court snubs plea on NEET protest crackdown | Trump's 200% tariff bomb on generic drugs: Here's how India could be hit | Rahul Gandhi, Priyanka Gandhi Vadra lead Congress march to PM Modi's residence over student protest crackdown | 'We can't ignore his concerns': Delhi HC gives Sonam Wangchuk big relief, clears shift to private hospital | 'Students are being tortured': Mamata Banerjee offers to join CJP protest in Delhi | Sikkim tunnel horror: 8 dead, several feared trapped after NHPC project collapse | As NEET protests intensify, PM Modi defends govt action, calls for 'foolproof' education system | After NEET storm, Modi govt faces fresh challenge as farmers march to Delhi over India-US trade deal | Jantar Mantar reclaimed! CJP defies overnight police eviction, returns to protest site

GVK Power & Infrastructure reports Rs. 712.67 Cr total income in Q1

| | Aug 14, 2014, at 04:13 am
Hyderabad, Aug 13 (IBNS): GVK Power & Infrastructure Limited (GVKPIL) on Wednesday announced its unaudited consolidated financial results for the quarter ended June, 2014 after its financial results were taken on record by the Board of Directors at its meeting held.

GVKPIL registered a consolidated total income from operations of Rs. 712.67 Crore for the quarter ended June 30, 2014, as against Rs. 699.52 Crore during the corresponding quarter of the previous year.

GVKPIL’s consolidated net loss for the quarter ended June 30, 2014 is Rs. 281.34 Crore as against a net loss of Rs. 30.59 Crore in the corresponding quarter of the previous year.

The company said in a statement: "The loss in MIAL is attributable to the one-time charge of Rs. 286.78 Crore which is the written down value of the old terminal T2 that has been demolished. The higher financial expenses (Rs. 130.30 Crore) and higher depreciation (Rs. 137.17 Crore, which includes Rs. 29.21 Crore due to changed useful life of assets as per the new company’s Act effective April 1, 2014) are on account of the capitalisation of the new terminal T2.  In addition, tariff through which we can recover these costs for the control period beginning April 1, 2014 has not been issued yet, as such, aero revenues have been accounted based on the tariff order issued for the earlier control period."

"The loss in BIAL is attributable higher financial expenses (Rs. 53.35 Crore) and higher depreciation (Rs. 55.62 Crore) on account of the capitalisation of the expansion project (upgradation of the Terminal and facilities). Though the new tariff through which we can recover costs, has been approved, but its effective July 1, 2014. In addition to the above, there is a higher depreciation charge of Rs. 31.37 Crore due to changed useful life of assets as per the new company’s Act effective April1, 2014," the statement said.

"Stoppage of supply of gas for two power plants and reduced supply to one plant as a result of which the plants operated at very low capacity," it said.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.