July 22, 2026 10:41 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'We won't leave Jantar Mantar until Dharmendra Pradhan resigns': CJP draws red line | 'Don't waste our time': Supreme Court snubs plea on NEET protest crackdown | Trump's 200% tariff bomb on generic drugs: Here's how India could be hit | Rahul Gandhi, Priyanka Gandhi Vadra lead Congress march to PM Modi's residence over student protest crackdown | 'We can't ignore his concerns': Delhi HC gives Sonam Wangchuk big relief, clears shift to private hospital | 'Students are being tortured': Mamata Banerjee offers to join CJP protest in Delhi | Sikkim tunnel horror: 8 dead, several feared trapped after NHPC project collapse | As NEET protests intensify, PM Modi defends govt action, calls for 'foolproof' education system | After NEET storm, Modi govt faces fresh challenge as farmers march to Delhi over India-US trade deal | Jantar Mantar reclaimed! CJP defies overnight police eviction, returns to protest site

Kolkata: Wacker opens logistics centre at Amtala production site

| | Jul 11, 2014, at 04:55 am
Kolkata, July 10 (IBNS): The Munich-based chemical group Wacker on Thursday announced the opening of a new logistics facility at its production site in Amtala near Kolkata.
The high-bay warehouse has a capacity of 5000 pallet spaces and will be operated by Wacker Metroark Chemicals Pvt. Ltd. (WMC), a joint venture between WACKER and Kolkata based Metroark Ltd. Pvt.. 
 
The new logistics centre compliments WMC’s existing network of warehouses strategically located in Mumbai, Delhi, Chennai and Kolkata.
 
At the opening ceremony, attended by WMC Executive Director Levi Cottington and WMC Managing Director Soumitra Mukherjee, Christian Hartel, President of WACKER’s silicones business division, said the new facility will help maximize flexibilty of logistics, increase delivery speed, and minimize lead times for customers. 
 
“This investemt will strengthen our growth opportunities in India. Therefore, the warehouse has more capacity than we will use currently”, Hartel said. 
 
He emphasized that investing more than one million euros for the facility will have an immediate effect on WMC’s ability to increase the efficiency of its logistics operations. “This will enhance the accuracy and traceability of our deliveries for our customers‎, and will ultimately help to keep the costs in line," he said.
 
The high-bay warehouse has a capacity of about 5000 pallet spaces and utilizes ten layer racking. It uses Very Narrow Aisle (VNA) forklifts that are wire guided to retrieve goods. 
 
The SAP warehouse management module ensures improved insight into the inventory and storage locations. Scanners will keep track of various transactions in the warehouse. Thus, the inventory information is made available to the operators in real time via a computer interface attached to the VNA.
 
 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.