October 19, 2026 02:36 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'Internet access a fundamental right for children': SC rejects age-based 'blanket' ban | 'We will fight our own government': RG Kar victim's father threatens fresh protest after Sandip Ghosh gets bail | RG Kar shocker: Sandip Ghosh gets bail as only 7 of 147 witnesses examined, junior doctor blasts CBI | Trump waives Russia-related sanctions | 'How dare Elon Musk?' Owaisi defends Modi after billionaire's 'real boss' jibe at Ambani | 'B****y S***': IAS officer's abuse of female colleague during virtual J&K meeting sparks row | Aamir Khan’s nephew Imran Khan asked to leave India by Oct 28 after joining anti-CEC protest | ‘Their crime? Demanding justice’: Rahul Gandhi slams 4 AM detention of Ankita Bhandari’s parents | ‘Bangladesh showed us the way’: Neha Bora’s remarks spark BJP attack on Rahul Gandhi | Chingrighata flyover skid scare: Bikes fall, anti-skid blocks installed overnight as Bengal Minister Agnimitra Paul faces criticism
NTPC
Image: UNI

NTPC’s captive mine coal prodn jumps 148%; April, 2023 despatch at record 2.95 MMT

| @indiablooms | May 03, 2023, at 04:58 am

New Delhi/IBNS: Government-owned power generator NTPC has registered a growth of 148% in coal production from its captive mines in April 2023 as compared to production registered in April last year.

NTPC recorded 2.75 million metric tonnes (MMT) of coal production during the month of April 2023 as compared to 1.11MMT recorded for the month of April 2022.

India’s largest power producer also achieved the highest-ever monthly coal despatch of 2.95 MMT in April 2023, a 140% increase on coal despatch volumes of 1.23 MMT achieved in the month of April 2022.

NTPC recorded a coal production of 23.2 million tonnes in FY23, witnessing a 65% growth against 14.02 million tonnes a year ago from its four operational coal mines -NTPC Pakri-Barwadih (Jharkhand), NTPC Chatti Bariatu (Jharkhand), NTPC Dulanga (Odisha) and NTPC Talaipalli (Chhattisgarh).

The digitization initiatives by the coal mining teams have helped in raising the bar in operational excellence in mining operations. The improved processes have helped in enhancing safety in mining operations and have also led to the implementation of e-SMP, a digitalized safety management plan, and a mobile app for safety, Sachetan.

NTPC Group’s installed capacity stands at 71,644MW.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.