January 16, 2026 04:59 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Major blow to Mamata! SC stays FIRs, flags state meddling in central probe as ‘serious issue’ | Supreme Court snub shocks Vijay’s Jana Nayagan, release now in deep trouble | Trump tariff bomb on Iran trade: Tharoor flags existential crisis for Indian exporters | 'Mobocracy in court?': SC explodes over Calcutta HC chaos in ED vs Mamata showdown | Dalal Street on hold! Maharashtra civic polls pull the plug on market action | Big blow to TMC! Calcutta High Court dismisses case against ED in I-PAC raid row | 10-minute delivery dead! Govt crackdown forces Blinkit, Swiggy and Zomato to backtrack after gig workers revolt | US tariff threats put India-Iran trade at risk – Chabahar Port becomes the high-stakes battleground! | Sensex slides 250 points as defence stocks bleed, Zomato parent Eternal soars | Markets rally big after US envoy calls India White House’s ‘most important ally’
Indian Railway
Image credit: Unsplash

Union Budget:National Rail Plan for India to create “Future Ready” Railway System by 203

| @indiablooms | Feb 01, 2021, at 09:56 pm

New Delhi: Indian Railways has received a record outlay of Rs. 1,10,055 crore, of which ` 1,07,100 crore is for capital expenditure.

This record outlay was announced by the Union Minister of Finance and Corporate Affairs Nirmala Sitharaman while presenting the Union Budget 2021-22 in the Parliament today.

Indian Railways have prepared a National Rail Plan for India – 2030. The Plan is to create a ‘future ready’ Railway system by 2030.

Sitharaman said, “Bringing down the logistic costs for our industry is at the core of our strategy to enable ‘Make in India’.”

The Finance Minister announced that Western Dedicated Freight Corridor (DFC) and Eastern DFC are expected to be commissioned by June 2022.

Further, the Finance Minister proposed the following additional initiatives to be taken up:

The Sonnagar – Gomoh Section (263.7 km) of Eastern DFC will be taken up in PPP mode in 2021-22. Gomoh-Dankuni section of 274.3 km will also be taken up in short succession.

Future dedicated freight corridor projects namely East Coast corridor from Kharagpur to Vijayawada, East-West Corridor from Bhusaval to Kharagpur to Dankuni and North-South corridor from Itarsi to Vijayawada will be undertaken. Detailed Project Reports will be undertaken in the first phase. 

100% electrification of Broad-Gauge routes will be completed by December, 2023. Broad Gauge Route Kilometers (RKM) electrified is expected to reach 46,000 RKM i.e., 72% by end of 2021 from 41,548 RKM on 1st Oct 2020.

Passenger Convenience and Safety

Smt. Sitharaman also proposed following measures for passenger convenience and safety:

Introduction of the aesthetically designed Vista Dome LHB coach on tourist routes to give a better travel experience to passengers.

High density network and highly utilized network routes of Indian railways will be provided with an indigenously developed automatic train protection system that eliminates train collision due to human error.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm