July 30, 2026 10:04 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Farmers storm Bhopal! Traffic crippled as protest over MSP intensifies | Supreme Court gives clean chit to Manmohan Singh in coal block scam case two years after death, accepts CBI closure report | Rahul Gandhi's 'student, idiot, andhbhakt' remark sparks uproar in Lok Sabha during anti-paper leak bill debate | Assam flood death toll climbs to 75; Over 3 lakh still affected as relief efforts intensify | 'You are simply useless': Kangana Ranaut hits back at CJP's Saurav Das in fresh Instagram attack | Assam floods: Death toll stays at 68 as over 5.24 lakh continue to battle deluge | 'Probe is meaningless if responsibility isn't fixed': Supreme Court slams Delhi Police over CJP protest crackdown | 'No protester will be left alone': CJP claims Centre shared FIR withdrawal copies after midnight talks | Bihar cop suspended after viral AK-47 firing video during NEET protest crackdown | After Dharmendra Pradhan's exit, 'E20 Janta Party' emerges, demands Nitin Gadkari's resignation over fuel policy
PMGSY
Unsplash

J&K: Roads construction under PMGSY in Baramulla in full swing despite Covid-19

| @indiablooms | Aug 09, 2020, at 11:41 pm

Srinagar: Jammu and Kashmir seems to be benefiting from the Pradhan Mantri Gram Sadak Yojana (PMGSY) as the construction of a road under it is now gaining pace after a brief halt due to COVID-19 imposed lockdown.

The government has approved up-gradation of the 5.25-km road from NH1A 46th Delina to Singhpora in Baramulla and the work is being executed under PMGSY at the cost of Rs.443.65 lakhs, reports ANI news agency.

Tara Singh, Sarpanch, Singhpora told ANI that the road is being constructed using better-quality materials. 

Local residents are facing hardships due to the road condition.

"We were waiting for the construction of the road in our area for several years. This wish is being fulfilled. The engineering team and other workers are doing work with great dedication," Rajveer Singh, a local resident told ANI.

"The length of the road is 5.25 kilometres and the project is sanctioned for Rs 443 lakhs," Peer Shahjahan Muhammad, Executive Engineer, PMGSY Division Baramulla told the Indian news agency.

 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.