July 30, 2026 01:11 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Farmers storm Bhopal! Traffic crippled as protest over MSP intensifies | Supreme Court gives clean chit to Manmohan Singh in coal block scam case two years after death, accepts CBI closure report | Rahul Gandhi's 'student, idiot, andhbhakt' remark sparks uproar in Lok Sabha during anti-paper leak bill debate | Assam flood death toll climbs to 75; Over 3 lakh still affected as relief efforts intensify | 'You are simply useless': Kangana Ranaut hits back at CJP's Saurav Das in fresh Instagram attack | Assam floods: Death toll stays at 68 as over 5.24 lakh continue to battle deluge | 'Probe is meaningless if responsibility isn't fixed': Supreme Court slams Delhi Police over CJP protest crackdown | 'No protester will be left alone': CJP claims Centre shared FIR withdrawal copies after midnight talks | Bihar cop suspended after viral AK-47 firing video during NEET protest crackdown | After Dharmendra Pradhan's exit, 'E20 Janta Party' emerges, demands Nitin Gadkari's resignation over fuel policy
Branwar bridge

Kashmir: Deputy Commissioner (DC) of Ganderbal inaugurates Branwar bridge

| @indiablooms | Sep 22, 2020, at 11:35 pm

Srinagar: Deputy Commissioner (DC) Ganderbal, Shafqat Iqbal on Sunday inaugurated the Branwar bridge constructed over the Power canal and upgradation work of Water Supply Scheme (WSS) Mammer B.

During his visit to Kangan Sub- division he also inspected several ongoing works.

The Executive Engineer R&B informed the DDC that the bridge was approved at the cost of Rs 1.50 crore with which over 10,000 souls of 4 villages including Mammer,

Thune, Awanpati and Branwar will be benefited.

On the occasion the DDC also inspected the progress of Thune-Branwar road of lengh 3 km which is approved at the cost of Rs. 5.90 crore.

The Executive Engineer R&B informed the DDC that the work on the road is in full swing and will get completed within stipulated timeframe.

Meanwhile, the DDC inaugurated the upgradation work at WSS Mammer-B which was approved under Back to Village 1 at the cost of Rs. 8.5 lakh The Executive Engineer PHE informed the DDC that with this up-gradation work morethan 10,000 souls of three villages including Mammer, Kasanapati and Thune will be supplied treated water through the same scheme now. 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.