July 10, 2026 01:00 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Indian techie allegedly kills wife in US, sends photo of her body to 'secret girlfriend' in India; arrested | 'I fled the city': Thane doctor quits after alleged assault by Shiv Sena leader | Sensex surges 500 points before losing steam, ends marginally higher after volatile trading session | US court drops charges against Indian-origin doctor who drove Tesla off 250-foot cliff with family | Dalal Street bleeds! Sensex tanks over 1,600 points after Trump declares Iran ceasefire 'over' | 'It's over': Trump says on ceasefire with Iran | PM Modi visits 1,000-year-old Prambanan Temple in Indonesia, shares majestic aerial view of the holy site | Baruipur minor rape-murder case: Key accused Pravash Mondal killed in encounter | 'We have been cheated': Egypt coach slams refereeing after Argentina match sparks controversy | From 0-2 to victory! Argentina stage miraculous comeback amid referee drama to crush Egypt's World Cup dream
Pakistan
Wallpaper Cave

$354 million power extension project in Pakistan awarded to Chinese firm

| @indiablooms | May 08, 2021, at 12:44 pm

Authorities in Pakistan have awarded a hydropower extension project worth $354 million to a Chinese firm, reported Dawn. The contract was signed following an international bidding process.

Pakistan’s Water and Power Development Authority had issued a global tender for the civil work on the 1,530MW Tarbela 5th Extension Hydropower Project.

The 5th extension project involves the construction of tunnel no. 5 of Tarbela dam with an approved PC-1 cost of $807 million. The cumulative generation capacity of the project would be 1,530MW with three generating units of 510MW each.

The International Bank for Recons­truction and Development (IBRD), the World Bank is providing $390m, while Asian Infrastructure Invest­ment Bank (AIIB) to give $300m loans.

The project is likely to take around three years for compilation and expected to be finished by June 2024. Once complicated, it would add 1.347 billion units of electricity annually to the national power grid.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.