July 06, 2026 01:08 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'Why can't citizens protest against the government? They are being made slaves by slapping cases': Bombay HC slams Mumbai Police, quashes activist's externment | 'First he cheats on me...': Siya Goyal's old pub video goes viral amid probe into fiancé Ketan Agarwal's alleged murder | Ronaldo's goal, Ramos' last-gasp winner send Portugal past Croatia, set up Spain clash | India-US trade deal almost done! Piyush Goyal hints at breakthrough | Ram Mandir donation scam: Champat Rai points finger at his own driver | PM Modi welcomes Japanese PM Sanae Takaichi as India-Japan ties enter a new era | 'Not an isolated incident': India slams Pakistan after 125-year-old historic Gurdwara is demolished | Ram Mandir donation theft: Six accused were employed by Varanasi-based security firm, probe reveals | Ayodhya Ram Temple donation theft: Probe says majority of money was allegedly stolen during Kumbh Mela | Commercial LPG price slashed by Rs 183.50 from July 1; check new rates in Delhi, Mumbai, Kolkata and Chennai
Pakistan
Photo Courtesy: Pixabay

Pakistan: NEPRA says Chinese power plants using inferior coal

| @indiablooms | Sep 23, 2023, at 12:49 am

The National Electric Power Regulatory Authority (Nepra), which is the power regulatory body of Pakistan, has exposed Chinese coal-fired power plants to using lower-quality imported coal.

According to reports, the plants had pledged to use coal with a calorific value of 6000 (CVs).

Not a single imported consignment meets the required standards and still they claim multi-billion rupees of capacity payments that are being collected from the public, reports The News International.

This revelation came to light during a public hearing conducted by Nepra on Thursday to review the existing mechanism, last revised in 2016, the newspaper reported.

Nepra Chairman Waseem Mukhtar headed the proceedings while the authority’s members including Mathar Niaz Rana (member Balochistan), Maqsood Anwar Khan (KP), Amina Ahmed (Punjab), and Rafique Ahmad Shaikh (Sindh) were in the presence.

It is important to mention that the coal-based current derated installed capacity is 6,777MW (foreign-funded on imported coal), with an outstanding capacity payment of a substantial Rs643 billion.

While citing documents, a Nepra member was quoted as saying by The News International, “Your documents say that you imported lower quality coal against what was promised in the agreements.”

Notably, the Sahiwal Coal Power Project, now known as Huaneng Shandong Ruyi (Pakistan) Energy (Limited), disclosed that it had imported multi-thousand tons of coal in July 2022 when prices were high, at a rate of Rs70000/ton ($380).

However, in response, the Nepra member said, "You claim capacity payment, but you don’t use costly coal.”

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.