October 21, 2026 03:58 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘We are seeing what is happening outside our country’: Delhi HC judge’s remark as CJP leaders Saurav Das and Ashutosh Ranka withdraw custody plea | Salman Khan was the original target? Tiger Shroff firing probe reveals shocking twist | ‘UN experts are an oxymoron’: Marco Rubio takes swipe at UN, refuses to comment on India's protests | ‘US ties with no country come at India's expense’: Marco Rubio addresses concerns over Pakistan, China | ‘Not meant to harm India’: Marco Rubio breaks silence on Trump’s tariff threat | Meloni makes Italian parents liable for children's vandalism after Milan riots: ‘Demonstrating is a right, devastating our cities is not’ | ‘Operation completed’: Tiger Shroff shooters allegedly alerted handlers after firing, probe reveals | 'I don't mind saying sorry 1,000 times': Sonu Nigam apologises to Kannadigas over ‘Pahalgam’ remark amid concert ban demand | After Vijay, is Dhanush eyeing politics? TVK calls Thalapathy an inspiration | Trump Says Paris Will Become ‘Muslim City Very Soon’, Blames Macron’s Immigration Policies
Pakistan PowerCuts
Image: Unsplash

Pakistan: Power cuts trouble people in Karachi since Saturday

| @indiablooms | May 24, 2021, at 05:21 pm

Karachi: People in Karachi city of Pakistan are facing a massive power outrage and still power has not been restored in several parts of the city.

The electricity remains suspended in Baldia Ittehad Town, Qaim Khani Colony, Orangi, Shantinagar, Korangi, Malir Shamsi Society, and Shah Faisal Colony, reports The News International.

Power cuts have been reported from several areas of Lyari ever since the electricity breakdown occurred on Saturday afternoon.

According to the official statement, KE’s 220 kV Extra High Tension network on Saturday afternoon experienced tripping along with the 220 kV NKI-Baldia 1&2 circuit, reports the newspaper.

"NTDC and KE teams immediately responded by coordinating closely for the restoration of the circuits," read the statement.

"The damaged busbar was isolated and alternate busbars were utilised to bring BQPS 1 back online," it said.

"Power from BQPS 2, NKI, and IPPS is being supplied to the city whereas a full load of BQPS 1 is expected to be added into the system in the next few hours," KE had added.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.