July 01, 2026 12:54 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'Dharmendra Pradhan will be responsible if anything happens': CJP warns as Sonam Wangchuk's health worsens on day 3 of hunger strike | Adani Ports seals $1.4 billion mega deal as MSC buys 49% stake in Vizhinjam port | Ram Temple donation scam: Former trust chief Champat Rai grilled by SIT for 2 hours, says report | Brazil escape Japan scare, Germany crash out as Paraguay script World Cup shocker | India overtakes Taiwan, South Korea to become world's fifth-largest equity market again | Pakistan strikes terror hideouts near Afghan border after Karachi bloodshed, 29 killed | Israel strikes back: Top October 7 militant “eliminated” in precision operation | Radharaman Das, who defended Bengal's vegetarian mid-day meal plan, loses ISKCON post | Fresh paper leak rocks India: Maharashtra TET postponed a day before exam, over 4 lakh aspirants affected | Pune fort murder case: Siya Goyal's brother says family would have called off marriage if she had objected
J&K Traffic

16 grade separators proposed in Srinagar to ease traffic burden

| @indiablooms | Nov 12, 2021, at 03:23 am

Srinagar/IBNS: Amid bulging vehicle population adding to the traffic woes in Srinagar, an official report on mobility has recommended 16 junctions for grade separation, including Sanat Nagar junction which is often marred by traffic congestion.

As per the official report of the J&K government, sixteen junctions are proposed for Grade separation in phase-I & II, eight junctions are proposed in phase-I - Nowgam Chowk, Sanat Nagar Chowk, Tengpora-Batamaloo Crossing, Bemina Chowk, Parimpora Chowk, Shalteng Chowk, Humhama Chowk and Jhelum Bund near GPO to SangarMal.

“Remaining eight junctions are proposed in phase-II - J&K Bank Corporate Office Crossing, Narbal Crossing, Jawaharpora Narbal Crossing, Mirgund Crossing, Kandizal Crossing, Ichigam Crossing, Pantha Chowk and Dalgate crossing. Four junctions are proposed for signalization in phase-I - Soura Chowk, Ilahi Bagh, Karan Nagar and Baghat Chowk,” the official report states.

The report further mentions that some major junctions which cater to heavy traffic and face congestion due to faulty geometry and absence of traffic control measures have been identified at grade geometric improvements with proper signalization (variable cycle, coordinated/synchronized or vehicle actuated signals) and with pedestrian signal phasing.

"The corridor improvement plan has been proposed for the junctions in series and located very close to enhance the overall capacity of the corridor," the report adds.

 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.