November 05, 2026 07:53 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'Debate in Parliament': Amit Shah challenges Rahul Gandhi after PM Modi dare | Delhi horror: Building collapses in Chawri Bazaar, 2 dead, several feared trapped | 'Trump is still your President': White House's post triggers wave of sarcastic reactions after US midterm setback | From endorsing to defeating: Indian-origin Nithya Raman stuns Karen Bass in Los Angeles mayoral race | 'You are either with us or against us': US targets Indian businessman, wife in fresh sanctions over Iran oil trade | Iran allows Indian ships free passage through Strait of Hormuz | US President Trump congratulates Democrats after midterm setback, says he is ready to work with them | ‘I wasn't on the ballot’: Trump explains Republican defeat after Democrats seize US Congress | CDS announces 2-year service extension for Agniveer scheme | Cyclone Murasu turns severe, Odisha evacuates people as Andhra braces for 120 kmph winds
Ambuja
Ambuja Cements Limited, part of the Adani Portfolio, has firmed up its next phase of expansion. Photo: Wikimedia Commons

Ambuja Cements bets big on expansion, targets 30 MTPA capacity boost

| @indiablooms | Nov 02, 2026, at 06:06 pm

Ambuja Cements Limited, part of the Adani Portfolio, has firmed up its next phase of expansion, with new greenfield and brownfield projects planned to add 30 MTPA of cement capacity across key markets.

The programme will expand its manufacturing network across the East, West and North,building on its current 113.5 MTPA pan-India cement capacity across 24 integrated plants and 24

grinding units.

The expansion includes new grinding capacities of ~15.5 MTPA in West Cluster, 11.6 MTPA in East Cluster and 2.9 MTPA in North Cluster. We are adding capacities in East Cluster at Rangia (2.9 MTPA), Hojai (2.9 MTPA) in Assam; Godda (2.9 MTPA) in Jharkhand; Muzaffarpur (2.9 MTPA) in Bihar; West Cluster at Mundra (2.9 MTPA) and Hazira (2.9 MTPA) in Gujarat; Raigad (2.9 MTPA), Kalyan (2.9 MTPA), Dahanu (0.7 MTPA) and Amravati (2.9 MTPA) in Maharashtra; and North cluster at Dadri Line 2 (2.9 MTPA) in Uttar Pradesh. The programme also includes new clinker capacity in East cluster at Umrangso (4 MTPA) in Assam, West cluster at Maratha (4 MTPA) and Mundra (2.3MTPA), strengthening the upstream network required to support the expanded grinding footprint.

Vinod Bahety, CEO – Cement Business, Adani Group, said, “Our next phase of expansion is focused on quality of growth and creating a more balanced manufacturing network. By strengthening the link between clinker and grinding capacity and expanding closer to the high growth potential key markets, we are building greater flexibility into the network. As we scale, our focus is on combining market reach with logistics and cost efficiencies so that every capacity addition strengthens the competitiveness of the overall business. We have a vibrant supply chain ecosystem with stronger Brand Equity and share of Premium Cement in these markets. The growth footprint will compliment well with our value based strategic growth. This phase of growth and additional debottlenecking initiatives will ramp up total capacity to 155 MTPA by FY’30. The total growth capex program is around Rs. 14,500 Cr. Apart from increasing market share, these capacities will also help to reduce manufacturing cost by bringing higher efficiencies. Being closer to the market, it will also help in reducing lead distance and thereby logistics cost. In all, it will pave the journey to achieve a cost of Rs. 4,000 PMT by FY’28”.

The new programme builds on capacity expansion already under execution. During H1 FY27, the Company added 4.6 MTPA through the 1.2 MTPA brownfield expansion at Dahej in Gujarat, the new 2.4 MTPA Salai Banwa Grinding Unit in Uttar Pradesh and a 1.0 MTPA brownfield expansion at Kalamboli in Maharashtra, taking overall cement capacity to 113.5 MTPA.

The near-term pipeline will further strengthen this base, with another 3.2 MTPA across Bathinda GU (1.2 MTPA) in Punjab (North cluster), Jodhpur Penna IU (2 MTPA) in Rajasthan, stabilised and expected to ramp up in H2 FY’27. In addition, the Warisaliganj GU (2.4 MTPA) in Bihar (East Cluster) will be commissioned in H2 FY’27. The Company’s total capacity is expected to reach 119 MTPA by end of March 2027.

Since the acquisition, Ambuja has completed 11 capacity projects, adding 16.3 MTPA of cement capacity and 9.0 MTPA of clinker capacity up to 30 September 2026. The new 30 MTPA expansion programme represents the next leg of this journey, further strengthening the scale, geographic reach and efficiency of its pan-India manufacturing network of 25 Integrated Units (IU), 37 Grinding Units (GU) and 3 Clinker Units (CU).

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.