September 24, 2026 03:50 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘I don’t care if you die’: Driver’s chilling response before Noida bus went up in flames | Contempt case against CEC Gyanesh Kumar? Supreme Court advocate seeks AG's consent | Days after Jamui outrage, another girl sexually harassed in Bihar; 4 arrested | 9 burnt to death as sleeper bus carrying 35 catches fire on Noida highway | ‘Gyanesh, it’s done bro!’: CJP turns up heat on CEC after explosive SIR report | ECI breaks silence on SIR row: Poll body says all decisions were ‘unanimous’ despite differences | Gyanesh Kumar under fire: Opposition seeks CEC’s removal as SIR row explodes over report of 14 internal ECI objections | SIR row explodes: Report claims 14 objections by 2 Election Commissioners; Opposition demands CEC Gyanesh Kumar's removal | IIT Bombay professor Suryanarayana Doolla sent on leave amid Sahil Wakode death controversy: Report | Narendra Modi's Canada visit confirmed: Carney eyes trade deal by year-end

‘Centre for Disability Sports’ to be set up at Gwalior

| @indiablooms | Mar 03, 2019, at 01:43 pm

New Delhi, Mar 3 (IBNS): A‘Centre for Disability Sports’will be set up at Gwalior in Madhya Pradesh.

The proposal regarding setting up of it has been approved by the Government. It will be registered under the Societies Registration Act, 1860, which is to function under the name of Centre for Disability Sports, Gwalior.Improved sports infrastructure created by this Centre will ensure effective participation of Persons with Disabilities (PwDs) in sports activities and also enable them to compete at national and international levels.

Setting up of the Centre will develop a sense of belonging in Divyangjan to facilitate their integration in society. 

Taking 1st April, 2019 as the zero date, the project is expected to be completed in two yeartime, i.e, by 31stMarch, 2021. Thereafter, it will take another 6 months for the Centre to become operational.


Once operational, this Centre will result in employment of 140 personnel. In addition, construction and allied activities will also generate considerable employment opportunities.Setting up of the Centre shall entail an estimated cost of Rs 170.99 crore (Non-recurring Rs.151.16 crore and Recurring Rs 19.83 crore),spread over a period of 5 years.

The Centre will have an Outdoor Athletic Stadium, Indoor Sports Complex, Basement Parking Facility; Aquatic Centre having 2 Swimming Pools, one covered Pool and an Outdoor Pool; High Performance Centre with classrooms; medical facilities; Sports Science Centre; hostel facilities for athletes, support facilities including accessible lockers, dining, recreational amenities and Administrative Block.

The facilities so developed would be multi-functional centres with provision for training, selection, sports academics and research, medical support, spectator galleries and suitable for holding national/international events.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.