March 03, 2025 09:21 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Crucial to have Trump’s support, says Zelenskyy a day after fiery White House exchange | 'We're looking for peace, Zelenskyy wants Russia-Ukraine war to continue': Donald Trump after White House public spat | Volodymyr Zelenskyy refuses to apologise to Donald Trump after public spat over Russia-Ukraine war | 'Make a deal or we are out': Donald Trump tells Volodymyr Zelenskyy at White House | Himachal govt seeks fund from temple to support welfare schemes, BJP calls move 'shocking' | Injustice to opposition MLAs: Atishi writes to Delhi Assembly Speaker on suspension of 21 AAP lawmakers | We will leave for US tomorrow: Father of Indian student Neelam Shinde after urgent visa grant | 'Not joining BJP or floating any party': Abhishek Banerjee dismisses rumours of his split from TMC | Pune bus rape accused arrested after 75-hour manhunt | Finance Secretary Tuhin Kanta Pandey appointed as new SEBI chief
Manoj Sinha
Image: PIB

Jammu and Kashmir: Nitin Gadkari inspects Zojila Tunnel

| @indiablooms | Apr 10, 2023, at 11:23 pm

Union Minister for Road Transport and Highways Nitin Gadkari today inspected Zojila Tunnel, Asia's longest tunnel to establish all-weather connectivity for Ladakh and an important project implemented in Jammu and Kashmir with the Lieutenant Governor of Jammu and Kashmir Manoj Sinha and members of Parliament of Parliamentary Consultative Committee on Road Transport and Highways.

19 tunnels are being constructed in Jammu and Kashmir at a cost of Rs  25000 crore.

Under this, the construction of 13.14 km long tunnel and approach road at a cost of Rs 6800 crore is in progress in Zojila. It is a 7.57 m high horseshoe-shaped single-tube, 2-lane tunnel, which will pass under the Zojila Pass in the Himalayas between Ganderbal in Kashmir and Drass town in Kargil district of Ladakh.

The project includes a Smart Tunnel (SCADA) system, which has been constructed using the New Austrian Tunneling Method.

It is equipped with facilities like CCTV, radio control, uninterrupted power supply, ventilation. The use of modern technology in this project has saved the Government of India more than 5000 crore rupees.

Under the Zojila Tunnel project,the main Zojila tunnel of 13,153 meters with 4 culverts of total length of 810 meters, 4 Nilgrar tunnels of total length of 4,821 meters, 8 cut and covers of total length of 2,350 meters and three 500 meters, 391 meters and 220 meters of  vertical ventilation shaft are proposed. So far 28% work of Zojila Tunnel has been completed.

With the construction of this tunnel, there will be all-weather connectivity for Ladakh.

Curently, the average travel time to cross the Zojila Pass sometimes takes three hours, after the completion of this tunnel the travel time will come down to 20 minutes.

The reduction in travel time will ultimately result in fuel savings.

The terrain near Zojila Pass is extremely inhospitable, with many fatal accidents taking place here every year. After the completion of Zojila Tunnel, the chances of accidents will be zero.

This tunnel will provide year-round connectivity between the Kashmir Valley and Ladakh, which will be extremely important for the development of Ladakh, promotion of tourism, free movement of local goods and movement of Indian armed forces in case of emergency.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.