August 13, 2026 11:00 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Netaji row: Suvendu Adhikari govt strips BJP MP Anant Maharaj of state honour | Sukhbir Badal attacked by Nihang Sikh with kirpan at Maharashtra gurdwara; assailant detained | ‘If you cannot do it, we will pass an order’: Supreme Court’s final warning to Centre on food labels | ‘Time to move on’: Bombay HC sends strong message in Vijay Mallya-bank dispute | Netaji row explodes in Bengal: Suvendu Adhikari orders police action over ‘derogatory’ posts | Kolkata's NRS Hospital nurse found dead in washroom during night shift | RG Kar rape-murder case takes fresh turn as ex-TMC MLA Nirmal Ghosh arrested over cremation probe | ‘Govt has nothing to hide’: Amit Shah says ‘ready for debate’ on NEET crackdown; Rahul Gandhi hits back, ‘not interested in lecture’ | Tata Sons leadership shock: N Chandrasekaran won’t seek reappointment as chairman after February 2027 | ISI-linked Pakistani national arrested in Bengal over 'espionage' targeting Army, BSF, Railways

Road over-bridge near Asansol to ease traffic congestion

| | May 23, 2016, at 09:08 pm
Kolkata, May 23 (IBNS) An over-bridge (flyover) over the railway level crossing -- near Kumarpur in Asansol, West Bengal -- on GT Road will be constructed by the Eastern Railways and SAIL-ISP on shared cost basis.
The level crossing is across a stretch of the road that connects Asansol to industrial areas such as Barakar, Sitarampur, Rupnarayanpur, Kulti and Chittaranjan.
 
Manas Sarkar, Chief Engineer (CON-II), Eastern Railways and  Vivek Gupta. GM (Projects), SAIL-ISP signed the Memorandum  of Understanding (MoU) on Saturday on behalf of their respective organisations, in the presence of Babul Supriyo, Union Minister of State for Urban Development, Housing and Urban Poverty Alleviation, who laid the foundation stone of the over-bridge.
 
While the construction of the over-bridge ease the traffic congestion that occurred with the frequent closing of the level crossing gate, it will also allow SAIL-ISP to increase its steel dispatches from its newly-expanded 2.5mtpa capacity steel plant.
 
 
Images: Inauguration of road overbridge foundation stone and MoU signing

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.