December 16, 2025 09:55 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Goa nightclub fire horror: Luthra brothers brought back to India from Thailand, arrested | Messi chaos costs minister his job: Aroop Biswas resigns after Salt Lake Stadium fiasco | Bengal SIR draft list out: Around 58 lakh voters’ names dropped | Relief for Sonia, Rahul Gandhi as Delhi court refuses to act on ED chargesheet in National Herald case | Centre moves to replace MGNREGA with 'G Ram G', sets stage for winter session showdown | Messi surrounded by VIPs, fans rage: Five held in stadium vandalism case | 'Messi was uncomfortable, lost his cool!': Ex-India footballer reveals what really happened at chaotic Kolkata stadium | PM Modi embarks on historic three-nation visit to Jordan, Ethiopia, and Oman | Caught in Thailand! Fugitive Goa nightclub owners detained after deadly fire kills 25 | After Putin’s blockbuster Delhi visit, Modi set to host German Chancellor Friedrich Merz in January

Capacit'e Infraprojects bags new orders of Rs. 925 crore for construction of new high-rise buildings

| | Jan 21, 2016, at 01:35 am
Mumbai / Kolkata, Jan 20 (IBNS): Capacit'e Infraprojects Limited, a leading construction company which specialises in construction super-high rise buildings, on Wednesday announced that the company has bagged nine new construction orders aggregating to Rs925.79 crore from different developers across cities in the country.

Currently, Capacit’e order book position is close to Rs. 5,000 crore for construction projects spread across major cities in India.

In a major development recently, the company has bagged an Rs 217.80 crore construction order from Rustomjee Constructions for the construction of Rustomjee Seasons in Bandra (East), Mumbai. Scope of work for the project includes construction of six high-end residential towers comprising of three basements with 24 floors.

The construction work for this project has commenced and is expected to be completed in the 27 months.

It has also bagged an Rs 181.49 crore order from Twenty Five South Realty, a joint venture of Hubtown and the Wadhwa Group, for construction of residential towers in a phased manner at Hindoostan Mills Compound, Prabhadevi in Mumbai. The scope of work under this phase 1 includes construction of a residential tower comprising of 1 basement, 1 ground floor, 9 podium floors, 40 floors, 4 sky villas, 5 refuge floors, 3 service floors, 3 fire check floors and a terrace floor. The total height of the tower will be 240 m.

The company has also bagged an Rs 175.62 crore from Radius & Deserve Builders LLP for construction of six mass housing residential towers in Chembur, Mumbai. The construction work for the project has commenced and is expected to be complete in the next 26 months.

For the project, the company will be using imported tunnel formwork system to cut down the slab casting cycle times.

The tunnel form work combined with weld-mesh reinforcement technology enables construction of over five floors a month, delivering positively on the mass housing objectives. As this technology is new in India, Capacit'e will be availing the services of skilled manpower from Turkey for this project.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm