April 13, 2025 06:30 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
15 flights diverted, many delayed as dust storm hits Delhi, Haryana | AIADMK, BJP join hands again to contest Tamil Nadu elections under Edappadi K Palaniswami | PM Modi inaugurates Rs. 3,880-cr projects in Varanasi on 50th visit to his Lok Sabha constituency | Bengal job losers camp outside SSC office in Kolkata, demand mirror copies of genuine candidate list | Mumbai terror attack accused Tahawwur Rana sent to 18-day NIA custody | Donald Trump's latest tariff hike on Beijing brings additional rate on some Chinese goods to 145 pct: White House | Pakistan distances itself from 26/11 terror accused Tahawwur Rana, says he is 'Canadian national' | Tahawwur Rana’s extradition proof of Modi govt's diplomatic strength: Amit Shah | Adult unmarried parents can live together without marriage: Allahabad High Court | Bengal job losers hold massive rally in Kolkata protesting over police assault

L&T grabs 2x660 MW power project order in Bihar

| @indiablooms | Jun 24, 2019, at 05:26 pm

Mumbai, Jun 24 (UNI) Engineering Major, Larsen & Toubro (L&T) said its power business has bagged a mega engineering, procurement and construction (EPC) order from SJVN Thermal Private Limited to set up a 2x660 MW ultra-supercritical power plant in Buxar district, Bihar.

SJVN Thermal Private Limited is a wholly-owned subsidiary of SJVN Limited, a joint venture of the Government of India and the Government of Himachal Pradesh and a Mini Ratna public sector undertaking.

Prime Minister Narendra Modi had laid the foundation stone for the plant in March this year, company said in a filing with BSE.

The scope of work for L&T includes Design, Engineering, Manufacture, Procurement, Supply, Construction, Erection, Testing a Commissioning of Buxar Thermal Power Project (2x660 MW), on turnkey basis,covering steam generator, steam turbine generator, electrostatic precipitator, NOx control system, flue gas desulphurization (FGD) system and complete balance of plant (BoP) systems, including raw

water intake system, make-up water system, coal Et ash handling system, ash dyke, complete Eal system including switchyard and complete civil, structural and architectural works.

Commenting on the order, Shailendra Roy, CEO & Managing Director, L&T Power & WholeTime Director - L&T, said, 'L&T is honoured to take on the responsibility of executing this prestigious project.

Knowing the importance of this project for the state of Bihar, L&T shall aim to set new benchmarks in completion schedule, quality, safety and equipment / system performance. With majority of the equipment including boilers, turbines, generators, etc, being made locally in our world class manufacturing facilities at Hazira, this project will also go a long way in accomplishing the 'Make in India'initiative promoted by the Prime Minister." 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm
PM Modi on Budget 2024 Jul 23, 2024, at 09:30 pm
Close menu