August 17, 2026 03:10 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
After SC rebuke, BCI chief apologises to NALSAR students over enrolment freeze row | Independence Day: PM Modi’s big youth pitch— AI training, free coaching amid exam row and job concerns | ‘Shakti Ki Saptadhara’: Modi reveals 7 pillars to power India’s next leap in his I-Day speech from Red Fort | West Bengal STF arrests 3 more suspected Pakistani spies in Cooch Behar | Bengal man arrested in Bengaluru over terror links, Afghanistan travel plan | Ajit Doval breaks silence on Operation Sindoor in Discovery’s explosive new docuseries | Rahul Gandhi's 'mock hug' taunt sparks row; Centre stresses 'mutual respect' with Italy | Delhi on high alert: Bomb threat to High Court, airport and multiple locations ahead of I-Day | ‘Who are they to interfere?’: CJI Surya Kant slams Bar Council of India over NALSAR students’ enrolment row | 'Shows how low Congress has sunk': BJP slams Rahul Gandhi over Modi foreign policy jibe

New Mangalore Port Trust solar project commissioned

| | Aug 22, 2017, at 10:27 pm
Bengaluru, Aug 22 (IBNS): Bosch Limited, a leading supplier of technology and services, has commissioned a 4 MW solar project for the New Mangalore Port Trust (NMPT).

The project, executed by the Bosch Energy and Building Solutions (BEBS) team in India, is a ground-mounted installation on a land area of close to 18 acres.

It will deliver close to 20,000 units per day for the port’s captive consumption (equivalent to the power consumption of 5,000 urban households).

The Bosch team has leveraged its strong design and engineering expertise in innovating solutions for the PV (Photovoltaic) plant, along with NMPT and the Solar Energy Corporation of India (SECI) to realize this solar project.

The project will contribute to the long-term self-generation of power and to the reduction of CO2 to the tune of nearly 4,100 tonnes per annum.

The solar plant will also act as the energy gateway for NMPT, as the main metering from the electricity grid is located at the solar plant itself.

“NMPT is the latest project executed by the Bosch Energy and Building  Solutions (BEBS) team. Drawing on their wide experience, our design engineers have ensured that the project delivers long-term value for NMPT. The design of the solar plant is such that it will also allow for future expansion of the project.” said Venugopalan CM, head, Bosch Energy and Building Solutions.


“Sustainable infrastructure is a key element in the development story of India. Bosch views airports and seaports as a focus area for providing energy solutions - this seaport project is an additional feather in its cap. Bosch is proud to be associated with NMPT, one of the first seaports in India to go green with solar energy and thereby contribute to nation building” he further elaborated.


Since 2015, Bosch has partnered with Cochin International Airport Limited (CIAL) to realize solar projects of close to 20 MW capacity and is currently executing a 6 MW solar plant on a canal near the airport. In May 2017, it also commissioned a car-parking solar project and a 2.5 MW solar project near the active runway, for Bangalore International Airport Limited.


The NMPT project was awarded to Bosch through a competitive bidding process conducted by SECI. SECI also served as the overall consultant for the NMPT solar project.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.