June 26, 2026 01:33 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Amazon's massive India bet! Andy Jassy announces $48 billion investment after meeting PM Modi | Taratala warehouse collapse: Death toll climbs to 8, five arrested as SIT launches probe | Oil prices crash, IndiGo takes off! Aviation and fuel stocks emerge as biggest winners | Passport is a travel document, not conclusive proof of citizenship: MEA | Kolkata: Taratala warehouse roof collapses | Indian Army's Trishakti Corps restores lifeline connectivity in North Bengal between Siliguri and Mirik | 19 million barrels flow through Strait of Hormuz, Trump declares oil prices are falling | No Hindi, no NEET: Vijay reignites Tamil Nadu's biggest political flashpoints | Messi creates World Cup history with record-breaking double; Mbappe equals Klose's mark hours later | Tech giant Oracle slashes 21,000 jobs while betting big on AI

No shortage of Power for West Bengal: NTPC

| | Apr 04, 2016, at 07:30 pm
New Delhi. Apr 4 (IBNS) There is a dip in the water level at Farakka Feeder Canal due to diversion of water to Bangladesh as per the international treaty and as a result, NTPC said it has been forced to temporarily stop five units (1600 MW) out of its six units (2100 MW) at Farakka.

Currently, one unit of 500 MW is under operation. 

The situation is likely to continue till Apr 10

"However there will not be any shortage of power to the West Bengal as a result of these closures," NTPC said in a statement.

"The total allocation to West Bengal from NTPC stations is 786 MW, which can be fully met by NTPC from its stations, if power is requisitioned by the State. In fact, even now Farakka and Kahalgaon Stations are not fully scheduled, leading to partial loading. If required by the State, NTPC can also supply more than its allocation to West Bengal by supplying surplus power from NTPC stations. The State has also surrendered its 199 MW power allocation from NTPC Barh Stage-II (2X660 MW) in the State of Bihar," it said.

In short, enough power is available with NTPC to meet any requirement of the state, NTPC said.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm