August 17, 2026 01:42 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
After SC rebuke, BCI chief apologises to NALSAR students over enrolment freeze row | Independence Day: PM Modi’s big youth pitch— AI training, free coaching amid exam row and job concerns | ‘Shakti Ki Saptadhara’: Modi reveals 7 pillars to power India’s next leap in his I-Day speech from Red Fort | West Bengal STF arrests 3 more suspected Pakistani spies in Cooch Behar | Bengal man arrested in Bengaluru over terror links, Afghanistan travel plan | Ajit Doval breaks silence on Operation Sindoor in Discovery’s explosive new docuseries | Rahul Gandhi's 'mock hug' taunt sparks row; Centre stresses 'mutual respect' with Italy | Delhi on high alert: Bomb threat to High Court, airport and multiple locations ahead of I-Day | ‘Who are they to interfere?’: CJI Surya Kant slams Bar Council of India over NALSAR students’ enrolment row | 'Shows how low Congress has sunk': BJP slams Rahul Gandhi over Modi foreign policy jibe

Rebuilt blast furnace-1 ‘Parvati’ of SAIL, Rourkela Steel Plant blown in

| @indiablooms | May 09, 2018, at 01:12 am

New Delhi/Rourkela, May 8 (IBNS): Steel Authority of India Ltd. (SAIL) first blast furnace ‘Parvati’ situated at SAIL’s Rourkela Steel Plant (RSP) has been rebuilt under company’s modernization and expansion program and is successfully blown in on Wednesday.

SAIL-RSP’s Blast Furnace No.1 – Parvati is rebuilt with state-of-the-art features and additional capacity.

The useful volume of this rebuilt furnace, in its new avatar, has increased from 1139 cubic meter to 1710 cubic metre, as a result of which theannual production capacity of the furnace will go up from 0.438 MT per annum to 1.015 MT per annum. 

The rebuilt blast furnance was blown-in by Ashwini Kumar, CEO, RSP.

This technologically advanced blast furnace has advanced features which include new skip system, closed loop cooling system with soft water,twin flat cast houses at 90 degree apart with cast house defuming system, new turbo blower for high top pressure, new hot blast system for higher blast temperature, new coal dust injection system, new gas cleaning plant and a new dust catcher. 



Apart from boosting production these features will help reduce the dependence on coal which will, in turn, improve the carbon footprint making the new furnace more environment friendly.

Blast Furnace ‘Parvati’ was first blown in on 24th January 1959 and soon after it was dedicated to the nation on 3rd February 1959 by the then President of India Dr. Rajendra Prasad.

Since then, the blastfurnace was taken down five times for relining and major repair before it was put down on 5th August 2013 for total rebuilding.

The furnace was completely dismantled and a brand new furnace was installed on the same foundation with available space and resources.

The furnace in its modernised incarnation would surely go a long way in further strengthening the productivity and profitability of the Plant.

Also present during the blowing in were PK Pradhan, ED(P&A), Subhendra Das, ED(Works) and many other senior officers of SAIL-RSP.

 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.