July 13, 2026 04:41 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'Highway blocked, stones pelted, cops injured': BJP faces open revolt in Madhya Pradesh over Narottam Mishra ticket snub | Two Kolkata Police DCPs suspended over alleged remarks against Bengal CM Suvendu Adhikari | Bail to Bloodbath: Telangana man allegedly kills wife, kids and teen who accused him of sexual harassment | Prakash Raj gets bail in multiple voter registration case linked to 2019 polls | ED raids Shekhar Suman associate's premises in FEMA case; phone allegedly thrown from 13th floor | 'Candidate fled': Prashant Kishor jibes BJP over Bankipur nominee change | BJP replaces candidate days before high-stakes Bankipur bypoll | Foreign franchise league enters India! BBL opener to be played in Chennai, announce Modi-Albanese | 'They could have stopped me': Vijay blames police, former DMK government over Karur stampede | 'People will correct their 2025 mistake': Electoral debutant Prashant Kishor predicts BJP defeat in Bankipur
J&K Traffic

16 grade separators proposed in Srinagar to ease traffic burden

| @indiablooms | Nov 12, 2021, at 03:23 am

Srinagar/IBNS: Amid bulging vehicle population adding to the traffic woes in Srinagar, an official report on mobility has recommended 16 junctions for grade separation, including Sanat Nagar junction which is often marred by traffic congestion.

As per the official report of the J&K government, sixteen junctions are proposed for Grade separation in phase-I & II, eight junctions are proposed in phase-I - Nowgam Chowk, Sanat Nagar Chowk, Tengpora-Batamaloo Crossing, Bemina Chowk, Parimpora Chowk, Shalteng Chowk, Humhama Chowk and Jhelum Bund near GPO to SangarMal.

“Remaining eight junctions are proposed in phase-II - J&K Bank Corporate Office Crossing, Narbal Crossing, Jawaharpora Narbal Crossing, Mirgund Crossing, Kandizal Crossing, Ichigam Crossing, Pantha Chowk and Dalgate crossing. Four junctions are proposed for signalization in phase-I - Soura Chowk, Ilahi Bagh, Karan Nagar and Baghat Chowk,” the official report states.

The report further mentions that some major junctions which cater to heavy traffic and face congestion due to faulty geometry and absence of traffic control measures have been identified at grade geometric improvements with proper signalization (variable cycle, coordinated/synchronized or vehicle actuated signals) and with pedestrian signal phasing.

"The corridor improvement plan has been proposed for the junctions in series and located very close to enhance the overall capacity of the corridor," the report adds.

 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.