September 20, 2026 04:12 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Arvind Kejriwal, family ‘missing’ from Delhi voter list, claims Aam Aadmi Party | ‘No UPI above ₹2,000?’ Ghaziabad traders put up ‘cash only’ hoardings | Trump signs Russia sanctions bill: India faces fresh 100% tariff threat over Moscow oil | Caught using ChatGPT for exam answers, IIT Bombay student dies by suicide; students protest | Congress' Nandigram candidate arrested after Mamata's support amid TMC symbol row; Bengal bypoll gets chaotic | Gurugram murder shocker: Groom-to-be leaves sisters at Delhi restaurant to meet ex-colleague, found dead days later | Delhi horror: Teen allegedly gangraped, stabbed to death and dumped in field; dogs eat parts of body | TMC name, symbol frozen: EC tells rival factions to pick new identities ahead of Bengal bypolls | Married just 17 days ago: Hyderabad engineer mysteriously found dead at US home | ‘We will promote cash’: New UPI charge triggers trader backlash, Opposition protests
UttarakhandGlacierBurst
Image Credit: Defence Headquarters Twitter Handle

Effort to rescue 39 workers trapped inside tunnel continues a day after Uttarakhand glacier burst

| @indiablooms | Feb 09, 2021, at 04:56 am

Dehradun/IBNS: A massive operation is on since last night to rescue some 39 people believed to be trapped inside a tunnel after a glacier burst in Uttarakhand on Sunday, which caused flash floods leaving 18 dead and over 200 missing.

Workers from an NTPC thermal power plant were trapped inside a 12-foot high and 15-foot wide tunnel at Tapovan in Chamoli which was was blocked with slush and debris due to the glacier burst.

The tunnel is over 2.5 km long with just one entry and bifurcates into two, officials said.

According to the officers, it was hard to tell where the workers were trapped or whether they were together at all.

An official said it was believed that 34 people were trapped in one of the offshoots and five in the other.

There has been no contact with any of them so far.

"It will be a 24X7 operation," the official said.

Earthmovers and shovels were used by hundreds of personnel and locals during the night-long mission to unclog the tunnel's opening.

In the day, personnel held sticks to get a better grip as they entered the sludge-filled tunnel, said reports.

Teams are on standby with dragon light sets, oxygen cylinders and stretchers to provide immediate help to those brought out.

Relief and rescue operations are being conducted with a joint effort of Army, Navy, Airforce and NDRF teams.

At least 12 workers were rescued from a smaller tunnel in the same area on Sunday evening.

On Sunday, scores of hutments and residential houses were washed away in the flash floods, triggered by the breach of a portion of the Nanda Devi glacier at around 1045 hrs, flooding the Alaknanda river.

The gushing river water uprooted hundreds of trees that came in its way.

The flow of water from the country's tallest dam - Tehri dam - was stopped, to facilitate the smooth passage of rising waters on Rishi Ganga and Alaknanda.
All the villages and low lying areas on the banks were immediately vacated after the disaster and water flow from Srinagar dam was increased to manage higher water flows.

A 13.3 MW Rishiganga Power Project plant, which came in way of flash floods, was completely destroyed.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.