May 14, 2026 01:58 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Vijay-led TVK wins Tamil Nadu floor test as AIADMK split plays out | Congress veteran Sonia Gandhi admitted to Medanta Hospital in Gurugram | PM Modi halves convoy size after austerity call | Mulayam Singh's younger son Prateek Yadav dies at 38 | Protests erupt in Delhi after NEET UG 2026 cancellation over alleged paper leak | AIADMK cracks widen after Tamil Nadu defeat; faction backs Vijay-led TVK government | Himanta Biswa Sarma takes oath as Assam CM for second term after BJP’s landslide win | Bengali rights activist Garga Chatterjee arrested over alleged provocative remarks ahead of assembly polls | No return to full WFH yet: IT firms unlikely to change hybrid work model despite PM Modi’s appeal | Suvendu Adhikari Cabinet clears BSF land transfer, census rollout, Ayushman Bharat in Bengal
Defence Deal
The first Aircraft LA5033 of the Tejas Mk1A Aircraft series took to the skies from the HAL facility in Bengaluru on March 28, 2024. Photo: Wikimedia Commons/Government of India

India seals deal to buy 113 Tejas engines from US

| @indiablooms | Nov 08, 2025, at 01:54 am

New Delhi/IBNS: Hindustan Aeronautics Limited (HAL) on Friday signed a significant agreement with GE Aerospace to acquire 113 F404-GE-IN20 jet engines for its Tejas Light Combat Aircraft (LCA) programme—marking a positive turn in India-U.S. defence cooperation after months of tariff-related friction.

According to officials, engine deliveries under the deal are scheduled to start in 2027 and conclude by 2032.

HAL confirmed that the engines and accompanying support package will power the 97 Tejas Mk1A fighter jets being built under the latest phase of the LCA programme.

The announcement follows the Defence Ministry’s September contract worth Rs 62,370 crore with HAL for 97 Tejas Mk1A aircraft for the Indian Air Force (IAF).

These indigenously developed fighters are essential to replenishing the IAF’s dwindling combat fleet and replacing ageing jets, a critical step given China’s expanding military presence and continued support to Pakistan.

Production of the Tejas Mk1A has encountered delays due to sluggish engine supplies from GE.

Out of the 99 engines ordered in 2021, only four have been delivered so far, with GE citing post-pandemic supply chain disruptions as the main cause.

The Tejas is a single-engine, multi-role fighter designed for air defence, maritime patrol, and precision strike missions.

The Mk1A variant represents a major upgrade, showcasing India’s growing self-reliance in defence manufacturing.

The Mk1A made its maiden flight on October 17 in Nashik, Maharashtra, in the presence of Defence Minister Rajnath Singh, who also inaugurated HAL’s third production line for the aircraft.

The event came shortly after the retirement of two MiG-21 squadrons, leaving a gap that the Mk1A is expected to fill.

Till date, the IAF has inducted two squadrons from its initial order of 40 Tejas jets.

The 2021 order for 83 Mk1A fighters and the recent 97-aircraft deal bring the total planned deliveries to 180 by 2034—solidifying the Tejas programme as the backbone of India’s future air combat fleet.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.