September 21, 2026 12:02 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Arvind Kejriwal, family ‘missing’ from Delhi voter list, claims Aam Aadmi Party | ‘No UPI above ₹2,000?’ Ghaziabad traders put up ‘cash only’ hoardings | Trump signs Russia sanctions bill: India faces fresh 100% tariff threat over Moscow oil | Caught using ChatGPT for exam answers, IIT Bombay student dies by suicide; students protest | Congress' Nandigram candidate arrested after Mamata's support amid TMC symbol row; Bengal bypoll gets chaotic | Gurugram murder shocker: Groom-to-be leaves sisters at Delhi restaurant to meet ex-colleague, found dead days later | Delhi horror: Teen allegedly gangraped, stabbed to death and dumped in field; dogs eat parts of body | TMC name, symbol frozen: EC tells rival factions to pick new identities ahead of Bengal bypolls | Married just 17 days ago: Hyderabad engineer mysteriously found dead at US home | ‘We will promote cash’: New UPI charge triggers trader backlash, Opposition protests
Ganderbal

Jammu and Kashmir: DC reviews status of HWCs at Ganderbal

| @indiablooms | Mar 16, 2021, at 11:28 pm

Srinagar: The Deputy Commissioner (DC) Ganderbal, Shafqat Iqbal today chaired a meeting of the Health department to review the status of approved Health Wellness Centers (HWCs) in the district.

During the meeting, the DC was briefed through a PowerPoint presentation about the status of Health Institutions approved as Health and Wellness Centers block wise in the district, man power approved and utilization of funds.

The meeting was informed that 73 health institutions are approved as HWCs which include PHC, NTPHC and Sub Centers of the district.

While giving the details about approved Health Institutions as HWCs, it was given out that in 2020-21, 30 HWCs are approved and remaining were approved in 2018-19 and 2019-20.

Regarding the status of manpower, the CMO informed that 54 posts of MLHPs are sanctioned out of which 36 are in position.

The meeting also discussed the status of utilization of funds for equipment and repair and renovation of HWCs.

It was informed that in 2018-19, Rs 33 lakh was received for repair and renovation and Rs 6 lakh was received for equipment besides in 2019-20, Rs 1.31 crore was received out of which Rs 72 lakh is utilized on equipment and repair and renovation.

Meanwhile, the meeting also discussed the status of work progress on ongoing PHCs and NTPHCs in the district for which DC asked the Executive Engineer to expedite all the works in a planned manner to complete the infrastructure within stipulated timeline.

He also urged him to carry frequent field visits to inspect these works so that quality is ensured.

The meeting was attended by the Chief Planning Officer, Irfan Ahmad Giri, CMO, Dr. Mehraj-u-din, Executive Engineer R&B, DHO, BMOs and others concerned 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.