September 18, 2026 12:27 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Gurugram murder shocker: Groom-to-be leaves sisters at Delhi restaurant to meet ex-colleague, found dead days later | Delhi horror: Teen allegedly gangraped, stabbed to death and dumped in field; dogs eat parts of body | TMC name, symbol frozen: EC tells rival factions to pick new identities ahead of Bengal bypolls | Married just 17 days ago: Hyderabad engineer mysteriously found dead at US home | ‘We will promote cash’: New UPI charge triggers trader backlash, Opposition protests | Gurugram biker crash: Main accused Kalyan Bainsla sent to police custody for 2 days | ‘Just tax collection’: Ashneer Grover slams new UPI charges above Rs 2,000 | India condemns Houthi attack on Saudi Arabia, warns of threat to Red Sea shipping | Gurugram biker hit by car: Two including main accused arrested after viral road rage video, attempt to murder case filed | Gurugram horror caught on camera: ‘I felt unsafe’—car chases, rams woman biker and flees
ERA

Jammu and Kashmir: Old city to get first rigid concrete pavement road

| @indiablooms | Sep 22, 2020, at 11:41 pm

Srinagar: Developmental activities in the old city received a major impetus with the start of work on the up-gradation of the eastern foreshore road by Jammu and Kashmir Economic Reconstruction Agency (ERA).

Work on the vital road sub-project in was today started with Syed Abid Rasheed Shah, Chief Executive Officer, J&KERA/ Jhelum Tawi Flood Recovery Project (JTFRP), asking the Assistant Executive Engineer, who is in charge of the sub-project to undertake ribbon-cutting ceremony of the project.

The ecologically sensitive eastern foreshore road is a vital road link connecting the uptown Srinagar with the old city and is one of the most water-logging prone roads in the old city owing to its close proximity to Brari-Nambal lagoon.

The upgradation of the road would make it resilient to water-logging and protect it from the vagaries of the nature especially the chilling cold weather.

Abdul Wahid, project manager, J&K ERA, Kashmir informed the CEO, ERA/JTFRP that the sub-project involves upgradation of 3.60 km of the road around the Brari-Nambal lagoon in heart of the city.

Wahid said the road portion was being upgraded at an approximate cost of Rs 17.27crore and will be strengthened with the laying of three layers comprising of GSB (Granular Sub Base), DLC (Dry Lean Concrete) and the final layer of PQC (Pavement Quality Concrete).

Abid directed the engineers to expeditiously follow and try to resolve the impediments that may hamper the smooth execution of work on the sub-project.

He also asked the contractor to work on the sub-project in a planned and scientific manner. The CEO ERA also had an interaction with the locals present on the occasion who expressed their gratitude to ERA for making use of the latest technology to upgrade the road.

J&K ERA is the first organisation in Kashmir to make use of rigid concrete pavement technology in the upgradation of various road sub-projects in the most water-logging prone vital roads of the city to make them flood resilient. Besides benefiting thousands of commuters traveling through this vital road daily, the road will benefit thousands of people living in the old city areas of Shamaswari, FatehKadal, HabbaKadal, Bishember Nagar, Munawarbad, Khayam, Baba Demb and Khanyar. Basharat Jeelani Kawoosa, Director Technical JTFRP and other officers of ERA and JTFRP were also present on the occasion. 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.