September 21, 2026 12:44 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Arvind Kejriwal, family ‘missing’ from Delhi voter list, claims Aam Aadmi Party | ‘No UPI above ₹2,000?’ Ghaziabad traders put up ‘cash only’ hoardings | Trump signs Russia sanctions bill: India faces fresh 100% tariff threat over Moscow oil | Caught using ChatGPT for exam answers, IIT Bombay student dies by suicide; students protest | Congress' Nandigram candidate arrested after Mamata's support amid TMC symbol row; Bengal bypoll gets chaotic | Gurugram murder shocker: Groom-to-be leaves sisters at Delhi restaurant to meet ex-colleague, found dead days later | Delhi horror: Teen allegedly gangraped, stabbed to death and dumped in field; dogs eat parts of body | TMC name, symbol frozen: EC tells rival factions to pick new identities ahead of Bengal bypolls | Married just 17 days ago: Hyderabad engineer mysteriously found dead at US home | ‘We will promote cash’: New UPI charge triggers trader backlash, Opposition protests
Kshmir

Kashmir: CEO ERA, JTFRP inspects work on 120-bedded Specialized Bone & Joint hospital at Barzulla

| @indiablooms | Jun 05, 2021, at 01:57 am

Chief Executive Officer, J&K Economic Reconstruction Agency (ERA), Jhelum Tawi Flood Recovery Project (JTFRP), Dr Syed Abid Rasheed Shah, today inspected progress on construction of 120 bedded Specialized Orthopaedic Unit (additional hospital block) at Bone and Joint Hospital, Barzulla.

Pertinently, the prestigious project has been taken up under the component “Critical Infrastructure” of JTFRP funded by the World Bank.

Inspecting the ongoing works, Dr Abid directed the concerned officers to work in double shifts with full focus on quality parameters of the project ensuring timely completion. He asked the executing agency to ensure completion of the works on ground floor of the building before June end.

Dr Abid, while enquiring about the technical specifications of the building, directed the concerned engineers that the technical and quality parameters should be checked on regular basis for effective implementation.

He also directed the executing agency to initiate the process for procuring necessary medical infrastructure for the hospital which is part of the composite tender given to NPCC Limited. He asked the officers to constitute a committee of specialized doctors for vetting technical specifications and other requirements for procurement of medical equipments and other related items.

CEO was informed that the building will be G+4 structure with 120 beds capacity as well as technically advanced modular Operation theatres, pre-operative and post-operative units which will considerably augment the infrastructure of the valley’s largest centre for the orthopedic care.

Pertinent to mention that JTFRP, which is part of PM’s development package, has received major fillip in implementation in the last one year which has been recognized in various tripartite review meetings between the World Bank, the Department of Economic Affairs and the government of J&K.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.