February 12, 2026 03:26 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Bangladesh poll manifestos mirror India’s welfare schemes as BNP, Jamaat bet big on women, freebies | Drama ends: Pakistan makes U-turn on India boycott, to play T20 World Cup clash as per schedule | ‘Won’t allow any impediment in SIR’: Supreme Court pulls up Mamata govt over delay in sharing officers’ details | India-US trade deal: ‘Negotiations always two-way’, says Amul MD amid farmers’ concerns | Khamenei breaks 37-year-old ritual for first time amid escalating Iran-US tensions | India must push for energy independence amid global uncertainty: Vedanta chairman Anil Agarwal | Kanpur horror: Lamborghini driven by businessman’s son rams vehicles, injures six | ‘Namaste Trump beat Howdy Modi’: Congress slams PM Over India-US trade deal | Historic India-US trade pact: Tariffs cut, $500B market opportunity unlocked! | Big call from RBI: Repo rate stays at 5.25%, neutral stance continues
Kolkata Metro
The yellow line is set to commence on August 22. Photo: PR Team

Kolkata metro expansion: Yellow line from Noapara to improve connectivity to city airport

| @indiablooms | Aug 19, 2025, at 12:44 pm

The stretch of Yellow Line Corridor of Metro Railway, Kolkata between Noapara and Jai Hind Bimanbandar (6.77-Km) is now all set to commence metro services.

This stretch of metro section has two other stations enroute viz Dum Dum Cantonment and Jessore Road.

This will reduce the hardship of the residents of this area to reach Kolkata Airport  as after commissioning of this section fast and comfortable metro journey can be enjoyed to Kolkata Airport.

The total cost of this project is approximately Rs 1,866 crores with three newly built stations i.e. Dum Dum Cantonment, Jessore and Jai Hind Bimanbandar.

State of the art passenger amenities will be provided at the newly built stations.

First phase metro will ply on this 6.77-km long stretch having four stations. Jessore Road station is the only station which is being constructed on the surface on this stretch.

Noapara and Dum Dum Cantonment stations have been built on viaducts and Bimanbandar station is an underground station.

People residing at Baranagar, Tobin Road, Sinthee, Dum Dum, Nagerbazar, Kaikhali More areas will find it very convenient to go to any part of the city by using these stations.

Noapara is further connected to the southern part of Kolkata through an interchange point for the journey through the Blue Line from Noapara to Kavi Subhash.

Dum Dum Cantonment is also in the vicinity of Sealdah- Bongaon section of Eastern Railway.

There will be an adequate number of ticket counters, sitting benches, elevators, toilets for ladies, gents and divyangjan, Public Address System for the convenience of the passengers.

The Noapara-Airport stretch along with two other stretches - Sealdah-Esplanade and Ruby More-Beleghata - will be inaugurated by Prime Minister Narendra Modi on August 22.

(Photos: PR Team) 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.