May 11, 2026 11:04 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Big defence boost: India successfully tests advanced Agni MIRV missile | India, Singapore unite for tough action against terror and transnational crime | TVK crosses majority mark with VCK, IUML support | I bow before Bengal: PM Modi’s powerful gesture at Suvendu Adhikari’s oath goes viral | Bengal turns a new page: Suvendu Adhikari takes oath as CM amid massive NDA show of strength | Cloud over Tamil Nadu government formation as Governor asks Vijay to prove majority | 1 Year of Operation Sindoor: PM Modi says it showed India’s firm response to terror | ‘Larger conspiracy ahead of PM Modi’s visit’: BJP on killing of Suvendu Adhikari’s aide | ‘My car was on OLX for sale’: Siliguri owner says number plate used in Suvendu aide assassination may have been cloned online | ‘Pre-planned political assassination’: BJP’s Swapan Dasgupta on Suvendu aide’s killing

Nitin Gadkari to inaugurate cable stay bridge over river Mandovi in Goa on Sunday

| @indiablooms | Jan 25, 2019, at 06:06 pm

New Delhi, Jan 25 (IBNS): Union Minister for Road Transport & Highways, Shipping, Water Resources, River Development and Ganga Rejuvenation Nitin Gadkari will inaugurate the newly built, 5.1 km long, four-lane, cable stayed bridge over river Mandovi in Goa on Sunday.

The bridge will support and sustain burgeoning traffic in Panjim.

It will facilitate routing of Mumbai bound traffic coming in from Bangalore via Ponda route and Old Goa towards NH-17, bypassing the main Panjim City.

It will also help overcome the bottlenecks caused at Panaji KTC Circle, and Panaji Entrance as the same route is currently being used by local traffic as well as NH-17 Highway bound traffic.

About 66,000 vehicles use this route every day, leading to hours of congestion, especially during the peak tourist season in Goa.

The  bridge will also be an aesthetically pleasing landmark for tourism development in the state of Goa.

1,00,000 m3 of high strength, high performance concrete, enough to fill 40 Olympic size swimming pools, was used for making this fully indigenously built bridge.

Additionally, 13,000 MT of Corrosion Resistant Reinforcement Steel – the weight of 20,000 cars, 32000 square meter of Structural Steel Plates - enough to cover 6 soccer fields, 1800 km of High Tensile Pre-stressing Steel strands – equal to distance from Goa to Delhi, 265 Nos of Spherical Bridge Bearings, and 88 High Tensile Strength Cables in State-of-the-art Single Plane Harp type Cable Stay System equipped with real-time Force Monitoring technology were used for this 2,50,000 tons heavy bridge, which is equal to the weight of 570 Boeing-747 Jumbo jets.

 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.