October 02, 2026 07:19 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Flydubai cockpit attack: Injured Indian pilot Smit Machchhar airlifted to Abu Dhabi | India backs brave flydubai pilot Smit Machchhar, Ambassador meets family after cockpit attack | ‘Saved us from a 9/11’: PM Modi praises Captain Smit Machchhar after terrifying flydubai cockpit attack | 'India is proud': PM Modi hails Flydubai Captain Smit Machchhar as ‘hero’ after mid-air cockpit horror | ‘Too early to say’: Benjamin Netanyahu on Iran link to flydubai plane incident | ‘I didn’t wait, I ran’: Israeli dentist reveals how he saved wounded Flydubai captain during cockpit attack | Israel-bound flight lands in Saudi Arabia as pilots fight in cockpit, stabbing triggers hijack scare mid-air | Vimal ad row: SRK, Ajay Devgn, Tiger Shroff respond to FDA notices, says Tukaram Mundhe | Vijay’s TVK expands to Bengal? Party breaks silence on Purba Bardhaman office | ‘This guy is a monster’: Trump’s hilarious praise for Sundar Pichai, Google CEO’s witty reply

Approval for second unit of Kudankulam Nuclear Power Station

| | Jul 21, 2016, at 09:46 pm
New Delhi/Chennai: The second unit of Kudankulam Nuclear Power Project (KKNPP-2) attained first criticality (start of controlled self-sustaining nuclear fission chain reaction in the Reactor for the first time) after accord of regulatory and statutory clearances on July 10, 2016, Minister of Atomic Energy and Space, Dr Jitendra Singh, informed the Rajya Sabha on Thursday.

This will be followed by various tests, connection to the grid and raising of power in steps to full power in line with the stage-wise clearances of the Atomic Energy Regulatory Board (AERB).

The compliance certificates from Ministry of Environment and Forest and Tamil Nadu Pollution Control Board have been issued for the plant.

The capacity of KKNPP Unit-2 on full power operation would be 1000 MW. Electricity generated by central sector generating stations is allocated to the beneficiary states and union territories in the electricity region by the Ministry of Power.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.