May 14, 2026 01:09 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Vijay-led TVK wins Tamil Nadu floor test as AIADMK split plays out | Congress veteran Sonia Gandhi admitted to Medanta Hospital in Gurugram | PM Modi halves convoy size after austerity call | Mulayam Singh's younger son Prateek Yadav dies at 38 | Protests erupt in Delhi after NEET UG 2026 cancellation over alleged paper leak | AIADMK cracks widen after Tamil Nadu defeat; faction backs Vijay-led TVK government | Himanta Biswa Sarma takes oath as Assam CM for second term after BJP’s landslide win | Bengali rights activist Garga Chatterjee arrested over alleged provocative remarks ahead of assembly polls | No return to full WFH yet: IT firms unlikely to change hybrid work model despite PM Modi’s appeal | Suvendu Adhikari Cabinet clears BSF land transfer, census rollout, Ayushman Bharat in Bengal

India preparing for GSLV-D6: Singh

| | Jul 24, 2014, at 03:20 am
New Delhi, July 23 (IBNS) Union Minister of State (Independent Charge) for Ministry of Science and Technology, M/o Earth Sciences, D/o Atomic Energy and D/o Space Jitendra Singh on Wednesday said the GSLV project has successfully launched GSLV-D5 flight with indigenous Cryogenic engine and stage on Jan 5 from Satish Dhawan Space Centre, Sriharikota and is currently preparing for the next flight GSLV namely, GSLV-D6.
"The GSLV-F02, GSLV-D3 and GSLV-F06 flights could not accomplish the mission objectives. Subsequently, failure analysis committees were formed to (a) carry out in-depth analysis of the flight performance and identify causes for the failure, and (b) recommend corrective measures and future course of action on the GSLV Vehicle. The failure analysis committees have submitted their recommendations," Singh said in a reply to a written question in the Lok Saha on Wednesday.  
 
He said, "Based on the suggestions made by the failure analysis committees, ISRO has implemented the modifications and improvements in GSLV, which include independent inspection and quality checks for all critical components and sub-assemblies, change of bearing housing material, revision of tolerances and seal clearances of Fuel Booster Turbo Pump of Cryogenic Engine, redesign of the Cryogenic Stage Lower Shroud, revision of connector mounting scheme and wire tunnel configuration."
 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.