September 02, 2026 03:30 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
CJP calls off Sept 5 Delhi march after Supreme Court quashes FIRs against protesters | ‘Dismantle entire terror ecosystem’: Modi’s strong message at SCO Summit in Shehbaz’s presence | Modi’s big appeal after 7.8% GDP growth: ‘Don’t travel abroad, avoid destination weddings’ | Modi-Pezeshkian talks: Iran seeks India’s 'extensive contacts' to end West Asia war | Indus Waters Treaty row: India rejects Hague court order, says ‘no jurisdiction’ over its sovereign decisions | India beats the odds with 7.8% GDP growth; PM Modi has a message for critics | PM Modi meets Iranian President Masoud Pezeshkian during SCO summit in Kyrgyzstan | ‘Islam superior to all religions’: Karnataka minister’s remark sparks BJP-Congress war; resignation demand grows | PM Modi meets Iran's President Masoud Pezeshkian during SCO summit in Kyrgyzstan | VHP breaks silence on Durga Puja ‘guidelines’: No blanket non-veg ban, clarifies stand on theme pandals amid backlash
Kut Kul Pass
Image: Wikimedia Commons

Div Com Kashmir visits the work site at Nawab Bazar.

| @indiablooms | Feb 12, 2022, at 02:06 am

Srinagar/IBNS: The Divisional Commissioner (Div Com) Kashmir, Pandurang K Pole Thursday visited Nawab Bazar to inspect the work of removal of unhygienic material including garbage trash, building material from both embankments of Kut Kul being executed by Irrigation and Flood Control Department.

On the occasion, Div Com said that Kut Kul passing through Shehar-e-Khas will be cleaned and made navigable by March.

Meanwhile, Div Com directed the Executive Engineer to complete the work within a week.

He also directed contractors to start cleaning work at other places, simultaneously and officers to repair the remaining walls of the kul wherever needed.

Div Com enjoined on the Executive Engineer to communicate with locals and  make them aware about their responsibilities to keep Kul clean from garbage and other trash material.

Div Com was informed that the material is amassed during the day and taken  away to the dumping site by the late hours.

The 2.8 kilometres long Kul is being cleaned at the cost of 18.41 lakhs by the Irrigation and Flood Control Department.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.