August 16, 2026 09:12 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
After SC rebuke, BCI chief apologises to NALSAR students over enrolment freeze row | Independence Day: PM Modi’s big youth pitch— AI training, free coaching amid exam row and job concerns | ‘Shakti Ki Saptadhara’: Modi reveals 7 pillars to power India’s next leap in his I-Day speech from Red Fort | West Bengal STF arrests 3 more suspected Pakistani spies in Cooch Behar | Bengal man arrested in Bengaluru over terror links, Afghanistan travel plan | Ajit Doval breaks silence on Operation Sindoor in Discovery’s explosive new docuseries | Rahul Gandhi's 'mock hug' taunt sparks row; Centre stresses 'mutual respect' with Italy | Delhi on high alert: Bomb threat to High Court, airport and multiple locations ahead of I-Day | ‘Who are they to interfere?’: CJI Surya Kant slams Bar Council of India over NALSAR students’ enrolment row | 'Shows how low Congress has sunk': BJP slams Rahul Gandhi over Modi foreign policy jibe
The development comes as both countries prepare new loan framework to fund next-gen E10 trains. (Image courtesy: Pixabay)

Japan to gift Shinkansen trains for India’s bullet train trials, ahead of new loan pact

| @indiablooms | Apr 18, 2025, at 10:51 pm

New Delhi/ Tokyo: In a significant boost to India’s first bullet train project, Japan will donate two Shinkansen train sets to assist with testing and inspection of the Mumbai-Ahmedabad High-Speed Rail corridor, Japan Times has reported.

One E5 and one E3 series train will arrive in early 2026, each retrofitted with inspection equipment to assess operational challenges unique to Indian conditions, such as high temperatures and dust.

The data gathered from these test runs will help fine-tune the corridor’s systems and pave the way for the introduction of next-generation E10 trains, which are expected to be produced in India starting in the early 2030s.

Until then, modified semi-high-speed trains made domestically are expected to run on the corridor.

The Mumbai-Ahmedabad route marks a milestone in India’s infrastructure development, supported by Japan’s renowned Shinkansen technology.

The project is being funded predominantly through low-interest yen loans from the Japanese government, which cover about 80% of total costs.

With rising expenses, both governments are working to finalise a fresh loan framework to support the introduction of E10 trains, likely to be discussed during Prime Minister Narendra Modi’s upcoming visit to Japan for a bilateral summit.

The donated Shinkansen trains represent Japan’s engineering excellence.

The E5 is known for its speed and streamlined design, while the E3 series balances efficiency and passenger comfort.

Their deployment in India will generate vital insights into the track conditions and overall performance of the corridor.

Construction of the high-speed rail corridor, led by the National High-Speed Rail Corporation Limited (NHSRCL), has been progressing steadily since November 2021. So far, bridges have been built across six rivers in Gujarat as part of the 24 total river crossings along the route.

Highlighting the project's transformative potential, Union Railway Minister Ashwini Vaishnaw had earlier noted, “The bullet train project has to be seen from the perspective of integrating economies… You can have breakfast in Surat, complete your work in Mumbai, and return with your family by night.”

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.